Read all about: Water shortages causing the shutdown of Kiriwina’s main High School – x 5 water pumps to be installed – Kiriwina High School supplied with Dignity Kits – September Training trip preparations in full swing – June CFK VBA meeting, over 104 attendees.

If it is too hard to read as an embedded image CLICK HERE